Tag Archives: Malahide viaduct

Engineering Failures at Irish Rail

This week the Railway Accident Investigation Unit’s report about the Malahide Viaduct Collapse has been published. I am unhappy at the response so far to the extremely serious non-disaster that occurred along the viaduct on the 21st August 2009. The structural failures that occurred, owing to inadequate inspection and preventative maintenance, could have caused a large number of fatalities and a large number of injuries. It is extremely fortuitous that this was a non-disaster, rather than a disaster. In consequence of the hair’s breadth between the actual direct consequences of what happened and what the consequences could have been, a very serious shake-up of the status quo is called for and I do not feel reassured by the recommendations in the report of the Railway Accident Investigation Unit or the written response that has been published by Irish Rail.
Continue reading